国产成人精品三上悠亚久久哪里能看玩偶姐姐|julia被汗水浸湿的中文字幕精品韩国中文字幕|久久久国产精品一区国产 欧美 日韩 中文字幕|精品人妻午夜中文字幕av四季|久久久亚洲综合|99re热这里只有精品视频|91精品国产91久久久久久不卞|国产麻豆精品一区|精品人妻一区二区三区久久台湾|麻豆md0078沈芯语视频,亚洲精品白浆高清久久久久久中文字幕欧美情色 ,亚洲熟女av中文字幕男人总站国产精品福利推荐 ,日韩中文字幕精品人妻

01 02 03 04

Tiewei Technology - Track Changing Machine

Focus on railway traction, rescue, maintenance, intelligent automatic loading equipment research and development and manufacturing

TWRR301 Double - purpose sleeper changer

Is a professional sales of railway dual-purpose vehicle enterprise, engaged in railway dual-purpose vehicle application development for many years, with strong technical and customer service capabilities
Please call our service hotline if you have any needs

E_mail:[email protected]
Phone (wechat):156-0098-0932
Contact: Manager He


  t_er1

信息詳情

Product introduction


Railway construction equipment ---- public and railway dual-purpose excavator railway wheel train lifting and driving device, tie fixture. The excavator sleeper fixture is one of the railway maintenance equipment working devices newly designed and produced by our company. It is a front-end working device that can be installed on the excavator through the quick-change connector. Suitable for 6-13 tons excavator. At the same time, our factory modified the dual-purpose excavator, that is, the bottom device of the excavator walking on the railway track, which is more convenient in railway maintenance.

The equipment is suitable for the domestic 1435mm gauge, the walking speed is about 10-20KM/h, and the carrying weight is less than 15T. The utility model can drive the railway wheel system of lifting through the hydraulic system in the existing crawler excavator, so that the ordinary crawler excavator can run along the railway. It can be widely used in railway tie maintenance and replacement, line repair, and cable ditch construction on both sides of the railway.

型路軌兩用換枕機(jī)1

型路軌兩用換枕機(jī)3

型路軌兩用換枕機(jī)2


Argument


Technical parameters of railway

Applicable gauge

millimeter(mm)

1435(customizable)

Number of driving wheels

a(Units)

2

Drive wheel operation mode

 

Main engine joystick control

Railway track travel mode

 

Drive wheel travel

The way of railway operation

 

The drive wheel is convertible to the free wheel mode

Driving power form

 

One-piece motor

Railway track speed

km/h

10-20

Railway operating speed (free wheel)

km/h

2.4-4.4

Railway braking distance

millimeter(mm)

≤10000

Dead weight of vehicle

KG

≥10000

outfitting

 

Standard digging bucket, rotary scraper rotary slag cleaning bucket, rotary inclined screening bucket, ballast rotary screw loose machine, rotary inclined slope protection bucket, crushing hammer, road core scraping plate, high frequency screening bucket, etc

Similar Product

Contact Us

Mobile phone/wechat:156-0098-0932

E_mail:[email protected]
Website:drevomebel.com
Address: 1484, Building 16, West Jiyang Village, Shiliou Town, Fangshan District, Beijing